The ePortal system has been loaded on to the test environment and the team are UCLanafiying it!
The system is looking good and as it is being branded with the UCLan logo its really starting to look great! A presentation to the Senior Management Team and Heads of School from the suppliers went quite well. There are of course some concerns with the system – it is a very big step, but generally the benefits can be seen and the hope is there that it will be a successful project.
The project is progressing well. The data capture has been challenging but it’s all very new to everyone. We plan to review our data capture method as the initial system did not cover all the idiosyncrasies and complex set up of programme delivery at UCLan. It has certainly been an eye opener to see how challenging it is to create a timetable – especially without the assistance of software to do the actually scheduling for you!
So what has happened recently?
Create draft process for testing has now been completed and the draft To Be process is documented .
Review of data entry process has now been completed. Documents have been created capturing this activity ready to be transformed into a useful output.
We have produced a road map of 'as is' to 'to be' that takes us from the 'as is' process, through a trial of the 'to be' process through to it's implementation as well as a road map for the building of a timetable through the year.
We have decided to reschedule the activity of linking Banner and Trent for completion by March 2011. The system integration is being tested as part of the trials of the draft 'to be' process using manually processed data extraction and input routines. These will be automated during Jan - Mar 2011. Given the possibility of changes being required to these processes, it was felt that this two step approach to developing the interface software was preferable.
We have developed a series of possible scenarios the system will need to respond to.